Construction is ongoing at Pier 35, one of the final components of the East River Esplanade masterplan. Designed by SHoP Architects with Ken Smith Landscape Architects, the eco-park will anchor the northern boundary of the esplanade and feature a walkway with an inclined vine-covered wall that screens the adjacent Sanitation Department shed at Pier 36.

Closeup of the inclined screen wall.

Screen wall detail.

2018_10_12-Pier 35-DSC09386.jpg

Western edge of the site.

Screen wall detail.

Looking north towards Pier 35 from the East River Esplanade.

Architect: SHoP Architects; Landscape Architect: Ken Smith Landscape Architect; Engineers: Arup and HDR; Client: Economic Development Corporation; Program: Eco Park; Location: East River Esplanade; Completion: 2019.