Gansevoort Peninsula
nARCHITECTS · Field Operations · Hudson River Park · 2024
Construction has wrapped up at the Gansevoort Peninsul, a 5.5 acre addition to Hudson River Park that is located across from the Whitney Museum of Art. Designed by Field Operations, the park features a beach with 1,200 tons of sand, picnic area, boardwalk with a Pine Grove, a multi use sports field, a salt marsh at the northern boundary, and David Hammons’ public art installation Day’s End at the southern edge. The new addition also features an amenities pavilion by nArchitects that is clad in perforated corrugated cast-concrete panels that are backlit to create varying lighting effects. Completion of the pavilion is expected later this fall.
Amenities Pavilion by nArchitects.
Landscape Architect: Field Operations; Architect: nArchitects; Structural Engineer: Silman; MEP Engineer: Plus Group; Facade Consultant: Front; Client: Hudson River Park Trust; Program: Park and Amenities Pavilion; Location: Meatpacking District, New York, NY; Completion: October 2023.
Pier 57
Handel Architects · Hudson River Park · 2022
South facade of Pier 57 from Little Island.
Construction is nearing completion on the renovation of Pier 57 at the Hudson River Park in Chelsea. The pier originally opened in 1954 as an ocean liner pier for cargo and passenger services. At the time of its opening, the pier was the largest dock construction project by the City of New York.
Northwest corner.
West facade.
South facade.
In it's current renovation, the pier houses anchor tenants Google in a 250,000-square-foot space. Later this year, the James Beard Foundation is slated to open a showcase kitchen, dining and demonstration space, and food hall with vendor kiosks. A two acre public park occupies the roof. The project is led by developers RXR Realty with Youngwoo & Associates and Handel Architects is responsible for the design.
Rooftop Park
A 80,000 square foot public park at the rooftop, designed by Handel Architects in collaboration with !Melk Landscape Architecture, will offer a screening venue for the Tribeca Film Festival.
Rooftop park lawn with the round skylights for the Google offices below.
Google Offices
Google’s Hudson River campus on Pier 57 includes space for 450 employees, adding to the tech company’s New York staff that already totals over 12,000. Diller Scofidio + Renfro led the design of the interiors, along with HLW International.
Visitor landing with the skylights that are visible on the public rooftop park above.
Looking up at the skylights.
Breakout space along the south facade of the pier.
West terrace with views to Little Island and Lower Manhattan.
Architects: Handel Architects, Diller Scofidio + Renfro with HLW International (Google office interiors); Landscape Architect: !Melk Landscape Architecture; Developer: RXR Realty with YoungWoo & Associates; Program: Retail, Office, Park; Location: Chelsea, New York, NY; Completion: 2022.
Construction Update: Pier 97
Construction is underway on the renovation of Pier 97 at Hudson River Park, a conversion of the pier to park space. Designed by !melk, the pier park will feature a playground with water spray features, a synthetic turf field, a sloping sun lawn, sculptural shade structures, an elevated walkway with seating, an “all-ages” slide and a sunset deck complete with bistro tables, chaise lounges and two-tiered walls with seating. A comfort station located north of Pier 97 will include solar panels on the roof along with a food concession, public restrooms and a park maintenance area.
Landscape Architect: !melk; Client: Hudson River Park Trust; Program: Park; Location: Hell’s Kitchen, New York, NY; Completion: 2023.
Tour: Pier 55 - Little Island
Heatherwick Studio’s park, known as Little Island, at Pier 55 in Hudson River Park has officially opened. Located near the Meatpacking District and the High Line, the design of the 2.4 acre park features an undulating field of 132 pots with plantings sitting on 280 concrete piles. At the park’s peak, the pots rise 30 feet into the air and can weigh more than 90 tons. Four to six petals of lightweight concrete combine to form each of the pots. MNLA led the landscape design, which is inspired by the textures and colors of coastal Acadia National Park in Maine. The park offers a 700-seat amphitheater for music, dance, and theater productions, along with numerous pathways and viewing platforms.
Architect: Heatherwick Studio; Landscape Architect: Mathews Nielsen Landscape Architect; Client: Hudson River Park; Program: park; Location: Meatpacking District, New York, NY; Completion: 2021.
Construction Update: David Hammons' Days End at Hudson River Park
Construction is nearing completion on David Hammons’ Days End permanent installation in Hudson River Park’s Gansevoort Peninsula for the Whitney Museum of American Art and the Hudson River Park Trust. Inspired by Gordon Matta-Clark’s 1975 artwork also titled Days End, the open structure follows the outline of the Pier 52 shed that Matta-Clark cut five openings into. The sixth and final frame was installed this past weekend.
Artist: David Hammons; Client: Whitney Museum of American Art and Hudson River Park Trust; Location: Hudson River Park, New York, NY; Completion: 2021.
Construction Update: David Hammons' Days End at Hudson River Park
Construction is underway on David Hammons’ Days End permanent installation in Hudson River Park’s Gansevoort Peninsula for the Whitney Museum of American Art and the Hudson River Park Trust. Inspired by Gordon Matta-Clark’s 1975 artwork also titled Days End, the open structure follows the outline of the Pier 52 shed that Matta-Clark cut five openings into.
Artist: David Hammons; Client: Whitney Museum of American Art and Hudson River Park Trust; Location: Hudson River Park, New York, NY; Completion: 2021.
Construction Update: Pier 55 - Little Island
Installation of the concrete pots is nearing completion at Heatherwick Studio’s Pier 55 park in the Hudson River. Located near the Meatpacking District and the High Line, the design of the 2.4 acre park features an undulating field of 132 pots with plantings sitting on 280 concrete piles. At the park’s peak, the pots rise 30 feet into the air and can weigh more than 90 tons. Four to six petals of lightweight concrete combine to form each of the pots. MNLA is overseeing the landscape design, which is inspired by the textures and colors of coastal Acadia National Park in Maine. The park will offer a 700-seat amphitheater for music, dance, and theater productions, along with numerous pathways and viewing platforms. Completion is expected in the spring of 2021.
Little Island from the future site of Gansevoort Peninsula.
Planting mockup.
Architect: Heatherwick Studio; Landscape Architect: Mathews Nielsen Landscape Architect; Client: Hudson River Park; Program: park; Location: Meatpacking District, New York, NY; Completion: 2021.
Construction Update: Pier 55 - Little Island
Installation of the concrete pots is nearing completion at Heatherwick Studio’s Pier 55 park in the Hudson River. Located near the Meatpacking District and the High Line, the design of the 2.4 acre park features an undulating field of 132 pots with plantings sitting on 280 concrete piles. At the park’s peak, the pots rise 30 feet into the air and can weigh more than 90 tons. Four to six petals of lightweight concrete combine to form each of the pots. The park will offer a 700-seat amphitheater for music, dance, and theater productions, along with numerous pathways and viewing platforms. Completion is expected in the spring of 2021.
A renovated section of the adjacent Hudson River Park promenade, designed by Mathews Nielsen Landscape Architects, has also recently reopened.
Architect: Heatherwick Studio; Landscape Architect: Mathews Nielsen Landscape Architect; Client: Hudson River Park; Program: park; Location: Meatpacking District, New York, NY; Completion: 2021.
Construction Update: Pier 55 - Little Island
Installation of the concrete pots has begun at Heatherwick Studio’s Pier 55 park in the Hudson River. Located near the Meatpacking District and the High Line, the design of the 2.4 acre park features an undulating field of 132 pots with plantings sitting on 280 concrete piles. At the park’s peak, the pots rise 30 feet into the air and can weigh more than 90 tons. Four to six petals of lightweight concrete combine to form each of the pots. The park will offer a 700-seat amphitheater for music, dance, and theater productions, along with numerous pathways and viewing platforms. Completion is expected in the spring of 2021.
Architect: Heatherwick Studio; Client: Hudson River Park; Program: park; Location: Meatpacking District, New York, NY; Completion: 2021.
Construction Update: Pier 57
Southeast corner of the pier from 11th Avenue.
Construction is underway on the renovation of Pier 57 at the Hudson River Park in Chelsea. The pier originally opened in 1954 as an ocean liner pier for cargo and passenger services. At the time of its opening, the pier was the largest dock construction project by the City of New York.
South facade of the pier from the Hudson River Greenway.
In it's current renovation, the pier will house anchor tenants Google in a 250,000-square-foot space. Chef Anthony Bourdain is slated to open his Bourdain Market in a 100,000-square-foot space on the main concourse and mezzanine. A 80,000-square-foot public park will occupy the roof. The project is led by developers RXR Realty with Youngwoo & Associates and Handel Architects is responsible for the design.
New glass enclosure under installation at the south facade of the pier.
Northwest corner of the pier.
Architect: Handel Architects; Developer: RXR Realty with YoungWoo & Associates; Program: Retail, Office; Location: Chelsea, New York, NY; Completion: 2018.